5% of A + 4% of B = | 2 | (6% of A + 8% of B) |
3 |
⟹ | 5 | A + | 4 | B | = | 2 | ❨ | 6 | A + | 8 | B | ❩ |
100 | 100 | 3 | 100 | 100 |
⟹ | 1 | A + | 1 | B | = | 1 | A + | 4 | B |
20 | 25 | 25 | 75 |
⟹ | ❨ | 1 | - | 1 | ❩ A = | ❨ | 4 | - | 1 | ❩ B |
20 | 25 | 75 | 25 |
⟹ | 1 | A = | 1 | B |
100 | 75 |
A | = | 100 | = | 4 | . |
B | 75 | 3 |
∴ Required ratio = 4 : 3
4th observation i.e., 8 is the median.
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.