logo

CuriousTab

CuriousTab

Discussion


Home Certification SAP Certification Comments

  • Question
  • Which three entries have to be made to define the overhead structure completely? A. Accrual object(s) B. Overhead rates C. Deferral object(s) D. Base cost element(s) E. Overhead element(s)


  • Correct Answer
  • : A , B , D 


  • SAP Certification problems


    Search Results


    • 1. How can you assign a profit center to a sales order item? A. The profit center is taken from the customer master record. B. The profit center can be entered manually. C. The profit center for the material is set automatically. D. The profit center can be set with a substitution.
    • Discuss
    • 2. The SAP standard includes the standard controlling area ______ which can be used as a template for creating other controlling areas. A. 1000 B. 0001 C. IDES D. 0002
    • Discuss
    • 3. Before you can create cost centers, you must first create a _______ heirarchy. A. Logical B. Optimum C. Complete D. Standard
    • Discuss
    • 4. [CO-OM-CCA] Accounting can be divided into internal and external accounting. Which of the following areas are part of internal accounting? A. Product Cost Controlling B. Overhead Cost Controlling C. Asset Management D. Financial Accounting
    • Discuss
    • 5. [CO-OM-OPA] When creating an overhead cost order, the settlement rule must be entered in the control data. Which settlement receivers are available for internal orders? A. Asset B. Cost center C.Orders D. General ledger accounts E. Vendor
    • Discuss
    • 6. [CO-OM-CCA] Certain postings to a cost center can be blocked using a cost center indicator. Which of the following blocking indicators can be selected? A. Material withdrawals B. Primary costs actual/plan C. Revenues actual / plan D. Secondary costs actual/plan E. Commitments
    • Discuss
    • 7. [CO-OM-CCA] When a cost center is created, certain basic data must be entered. Which of the following are needed when creating a cost center. A. Assignment to company code B. Validity period C. Assignment to cost element D. Selection of activity unit E. Cost center category
    • Discuss
    • 8. The currency of the controlling area must always be the same as the currency of the company code.

    • Options
    • A. TRUE
    • B. FALSE
    • Discuss
    • 9. Identify the four main types of roadmaps reviewed. A. Download roadmap B. Global template roadmap C. Upgrade roadmap D. Solution management roadmap E. Implementation roadmap F. Solution roadmap
    • Discuss
    • 10. Of the items listed below, which are not features of configuration? A. Project documentation B. Transport change requests. C. Test case assignment D. Configure img objects E. Generate blueprint
    • Discuss


    Comments

    There are no comments.

Enter a new Comment