Change control management is utilized from the begining to the end of the project in order to keep it focused with an emphasis on the time and budget. Answer A is incorrect because change control management is not seperate from the other phases. Answer B is incorrect because the control plan must be throughout the other phases of a project. Its usage is not optional, and consistent utilization is imperative to managing scope creep and other scope expansions. Answer C is incorrect because the project sponsors is generally not responsible for the change control documentation, although it should be involved in the buy-in and approval process.
The IEEE 802.11b standard provides three non-overlapping channels.
A transmission to the MAC address ff : ff : ff : ff : ff : ff is a broadcast transmission to all stations.
After the expiration of the backoff algorithm , all hosts have equal priority.
To use VLSM, the routing protocols in use possess the capability to transmit subnet mask information.
The typical banner is a message of the day (MOTD) and is set by using the global configuration mode command banner motd.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.