  • Question
  • A process that specifies how formal verification and acceptance of the completed project deliverables will be obtained is a part of which plan?


  • Options
  • A. Project integration plan.
  • B. WBS development plan.
  • C. Configuration management plan.
  • D. Scope management plan.

  • Correct Answer
  • Scope management plan. 

    Explanation

    ?The work involved in performing the five processes of Project Scope Management is preceded by a planning effort by the project management team. This planning effort is part of the Develop Project Management Plan process, which produces a scope management plan that provides guidance on how project scope will be defined, documented, verified, managed, and controlled. The scope management plan may be formal or informal, highly detailed, or broadly framed, based upon the needs of the project.?


  • More questions

    • 1. Which two descriptions are correct about characteristics of IPv6 unicast addressing? (Choose two) A. Global addresses start with 2000::/3. B. Link-local addresses start with FF00::/10. C. Link-local addresses start with FE00:/12. D. There is only one loopback address and it is ::1.
    • Discuss
    • 2. What are the six OSPF route types?
    • Discuss
    • 3. How many non- overlapping channels are available with 802.11b?

    • Options
    • A. 3
    • B. 12
    • C. 23
    • D. 40
    • Discuss
    • 4. Which IEEE committee has been sanctioned by WAP and is called WPA2?
    • Discuss
    • 5. When a station sends a transmission to the MAC address ff : ff : ff : ff : ff : ff, what type of transmission is it?

    • Options
    • A. Unicast
    • B. Multicast
    • C. Anycast
    • D. Broadcast
    • Discuss
    • 6. In the operation of CSMA/CD, which host(s) have priority after the expiration of the backoff algorithm?

    • Options
    • A. All hosts have equal priority
    • B. The two hosts that caused the collision will have equal priority
    • C. The host that sent the jam signal after the collision
    • D. The host with the highest MAC address
    • Discuss
    • 7. What is the Classs A Private IP address space?
    • Discuss
    • 8. What is the Class C private IP address space?
    • Discuss
    • 9. To use VLSM, what capability must the routing protocols in use possess?

    • Options
    • A. Support for multicast
    • B. Multi-protocol support
    • C. Transmission of subnet mask information
    • D. Support for unequal load balancing
    • Discuss
    • 10. If you wanted administrators to see a message when logging into the router, which command would you use?

    • Options
    • A. message banner motd
    • B. banner message motd
    • C. banner motd
    • D. message motd
    • Discuss


    Comments

    There are no comments.

Enter a new Comment