Working efficiency of both typist together = 100/6 = 16.66%
Let the efficiency of first typist be x and second typist be (16.66 ?x)
First typist for 4 minute + second tyoistfor 6 minute = 80% work
?4x + (16.66 ?x) X 6 = 80%
?4x + 100% -6x = 80%,
?x = 10%
First typist typed 10% per minute, second typst typed (16.66 ?10) = 6.66% per minute
Slowest is second typist complete whole job in 100/6.66 = 15.01 = 15 minute
Given, 48 people can do a work in 17 days. So total work = 48 x 17 = 816
Work done by 48 people in 6 days = 288.
The remaining work = 816 - 288 = 528
After 6 days four workers left. So number of people working is 44
Total number of days required for 44 men to complete the remaining work = 528/44 = 12
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.