Sum = [(B.D.xT.D.)/ (B.D.-T.D.)]
= [(B.D.xT.D.)/B.G.]
T.D./B.G. = Sum/ B.D.
=1650/165
=10
Thus, if B.G. is Re 1, T.D. = Rs. 10.
If B.D.is Rs. ll, T.D.=Rs. 10.
If B.D. is Rs. 165, T.D. = Rs. [(10/11)xl65]
=Rs.150
And, B.G. = Rs. (165 - 150) = Rs, 15.
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
NA
Each previous number is multiplied by 2.
? 8 m shadow means original height = 12 m
? 1 m shadow means original height = 12/8 m
? 100 m shadow means original height = (12/8) x 100 m
= (6/4) x 100 = 6 x 25 = 150 m
Let 8% of 96 = y of 1/25
? (8 x 96)/100 = y/25
? y = (8 x 96 x 25)/100 = 192
Since the principal is not given, so data is inadequate.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.