Difficulty: Easy
Correct Answer: architectural working
Explanation:
Introduction / Context:
Construction projects require coordinated documentation to guide procurement and field installation. While many disciplines contribute, one set provides the core overall building information for layout, dimensions, assemblies, and finishes.
Given Data / Assumptions:
Concept / Approach:
The core deliverable is the architectural working drawings. These include site, floor plans, elevations, sections, details, schedules, and notes that define the building’s geometry and scope. Other trades coordinate to these documents.
Step-by-Step Solution:
Verification / Alternative check:
Typical bid sets and permit packages center on architectural sheets (A-series), with coordinated MEP/structural sheets aligned to them.
Why Other Options Are Wrong:
Mechanical: System-specific; not the primary comprehensive building set.
Isometric: A view type, not a complete drawing set.
All of the above: Overstates; the principal set is architectural working drawings.
Common Pitfalls:
Confusing visualization drawings with contract documents. Working drawings include precise dimensions, specifications references, and code compliance notes.
Final Answer:
architectural working
Discussion & Comments