CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Waste Water Engineering problems
1. The ratio of minimum hourly flow to the average flow of sewage is
Options
A. 1/4
B. 1/3
C. 1/2
D. 3/4
Show Answer
Scratch Pad
Discuss
Correct Answer: 1/3
2. Dilution method of disposing off sewage, is not preferred to
Options
A. when sewage is fresh
B. when diluting water has high dissolved oxygen content
C. when diluting water is used for water supply near the point of sewage disposed
D. when the diluting water is having flow currents
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: when diluting water is used for water supply near the point of sewage disposed
3. An inverted siphon is designed generally for
Options
A. one pipe
B. two pipes
C. three pipes
D. four pipes.
Show Answer
Scratch Pad
Discuss
Correct Answer: three pipes
4. The non-clog pump which permits solid matter to pass out with the liquid sewage, is
Options
A. centrifugal pump
B. reciprocating pump
C. pneumatic ejector
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: centrifugal pump
5. Pick up the in-correct statement from the following :
Options
A. Manholes are provided in sewer pipes at suitable intervals
B. Catch basins are generally provided in sewers for carrying drainage discharge
C. Inlets are generally provided in all sewers
D. None of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: Inlets are generally provided in all sewers
6. Bio-chemical oxygen demand (BOD) for the first 20 days in generally referred to
Options
A. initial demand
B. first stage demand
C. carbonaceous demand
D. all of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these.
7. For treating the sewage of a large city, you will recommend
Options
A. a sedimentation tank and an activated sludge treatment plant
B. a plant consisting of Imhoff tanks with low rate trickling filters
C. sedimentation tanks with high rate trickling filters
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: a sedimentation tank and an activated sludge treatment plant
8. A rainfall may be classified as acidic if its pH value is less or equal to
Options
A. 6
B. 7
C. 5
D. 6.5
Show Answer
Scratch Pad
Discuss
Correct Answer: 5
9. Clogging of sewers, is caused due to
Options
A. silting
B. low discharge
C. greasy and oily matters
D. domestic wastes thrown in manholes
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
10. Pick up the correct statement from the following :
Options
A. In treated sewage, 4 PPm of D.O. is essential
B. Only very fresh sewage contains some dissolved oxygen
C. The solubility of oxygen in sewage is 95% that is in distilled water
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
First
3
4
5
...
18
..
31
32
Last
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering