CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Concrete Technology problems
1. ISI has specified full strength of concrete after
Options
A. 7 days
B. 14 days
C. 21 days
D. 28 days
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: none of these.
2. Pick up the correct statement from the following:
Options
A. Construction joints are necessarily planned for their locations
B. Expansion joints are provided to accommodate thermal expansion
C. Construction joints are provided to control shrinkage cracks
D. Expansion joints need not be provided in foundation concrete
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
3. A construction joint is provided where
Options
A. bending moment is small
B. shear force is small
C. the member is supported by other member
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
4. Hardening of cement occurs at
Options
A. rapid rate during the first few days and afterwards it continues to increase at a decreased rate
B. slow rate during the first few days and afterwards it continues to increase at a rapid rate
C. uniform rate throughout its age
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: none of these.
5. Batching error means inaccuracy in the quantity of
Options
A. aggregates
B. cement
C. water
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
6. The maximum thickness of concrete floor of a cement warehouse, is
Options
A. 10 cm
B. 15 cm
C. 20 cm
D. 25 cm
E. 30 cm
Show Answer
Scratch Pad
Discuss
Correct Answer: 25 cm
7. Addition of pozzolana to cement causes
Options
A. reduction in permeability
B. loss of heat of hydration
C. reduction in bleeding
D. increase in curing time
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
8. Pick up the correct statement from the following:
Options
A. Water cement paste hardens due to hydration
B. During hardening cement binds the aggregates together
C. Cement provides strength, durability and water tightness to the concrete
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
9. Too wet concrete may cause
Options
A. weakness of concrete
B. excessive laitance
C. segregation
D. lower density
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
10. Pick up the correct statement from the following:
Options
A. Lime in excess, causes the cement to expand and disintegrate
B. Silica in excess, causes the cement to set slowly
C. Alumina in excess, reduces the strength of the cement
D. Magnesium oxide in excess, remains in free state and makes the cement unsound
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
First
9
10
11
...
16
..
22
23
Last
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering