CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Concrete Technology problems
1. Transport of concrete by pumps, is done for a distance of
Options
A. 100 m
B. 200 m
C. 300 m
D. 400 m
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: 400 m
2. An aggregate is said to be flaky if its least dimension is less than
Options
A. 1/5th of mean dimension
B. 2/5th of mean dimension
C. 3/5th of mean dimension
D. 4/5th of mean dimension
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: 3/5th of mean dimension
3. Vicat's apparatus is used for
Options
A. fineness test
B. consistency test
C. setting time test
D. soundness test
E. compressive strength test.
Show Answer
Scratch Pad
Discuss
Correct Answer: consistency test
4. To ensure constant moisture content in aggregates
Options
A. area of each aggregate pile should be large
B. height of each aggregate pile should not exceed 1.50 m
C. aggregate pile should be left for 24 hours before aggregates are used
D. conical heaps of aggregates should be avoided to prevent moisture variation
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
5. While compacting the concrete by a mechanical vibrator, the slump should not exceed
Options
A. 2.5 cm
B. 5.0 cm
C. 7.5 cm
D. 10 cm
E. 15 cm
Show Answer
Scratch Pad
Discuss
Correct Answer: 5.0 cm
6. Construction joints are generally provided in concrete
Options
A. roads
B. retaining walls
C. lining of canals
D. lining of tunnels
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
7. For quality control of Portland cement, the test essentially done is
Options
A. setting time
B. soundness
C. tensile strength
D. consistency
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
8. The maximum amount of dust which may be permitted in aggregates is
Options
A. 5% of the total aggregates for low workability with a coarse grading
B. 10% of the total aggregates for low workability with a fine grading
C. 20% of the total aggregates for a mix having high workability with fine grading
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
9. Pick up the correct statement from the following:
Options
A. Insufficient quantity of water makes the concrete mix harsh
B. Insufficient quantity of water makes the concrete unworkable
C. Excess quantity of water makes the concrete segregated
D. Excess quantity of water causes bleeding in concrete
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
10. For the construction of cement concrete floor, the maximum permissible size of aggregate, is
Options
A. 4 mm
B. 6 mm
C. 8 mm
D. 10 mm
E. 12 mm
Show Answer
Scratch Pad
Discuss
Correct Answer: 10 mm
First
4
5
6
...
14
..
22
23
Last
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering