CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Concrete Technology problems
1. Cement used for normal concrete construction, is obtained by burning a mixture of
Options
A. silicious and argillaceous materials
B. argilaceous and calcareous materials
C. silicious and catcareous materials
D. silicious, argillaceous and calcareous materials
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: silicious, argillaceous and calcareous materials
2. Permissible compressive strength of M 200 concrete grade is
Options
A. 100 kg/cm
2
B. 150 kg/cm
2
C. 200 kg/cm
2
D. 250 kg/cm
2
E. 300 kg/cm
2
Show Answer
Scratch Pad
Discuss
Correct Answer: 200 kg/cm
2
3. The 28 days cube strength of mass concrete using aggregates of maximum size 5 cm for gravity dams should be
Options
A. between 150 to 300 kg/cm
2
B. between 350 to 600 kg/cm
2
C. between 150 to 500 kg/cm
2
D. below 200 kg/cm
2
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: below 200 kg/cm
2
4. Strength of concrete with passage of time
Options
A. increases
B. decreases
C. fluctuates
D. remains constant.
Show Answer
Scratch Pad
Discuss
Correct Answer: increases
5. Setting time of cement increases by adding
Options
A. gypsum
B. hydrogen peroxide
C. calcium chloride
D. sodium oxide
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: gypsum
6. A flaky aggregate is said to be elongated if its length is
Options
A. equal to the mean size
B. twice the mean size
C. thrice the mean size
D. four times the mean size
E. five times the mean size.
Show Answer
Scratch Pad
Discuss
Correct Answer: twice the mean size
7. Higher workability of concrete is required if the structure is
Options
A. made with cement concrete
B. thick and reinfored
C. thin and heavily reinforced
D. thick and heavily reinfored.
Show Answer
Scratch Pad
Discuss
Correct Answer: thick and heavily reinfored.
8. If P, Y and Z are the weights of cement, fine aggregates and coarse aggregates respetively and W/C is the water cement ratio, the minimum quantity of water to be added to first batch, is obtained by the equation
Options
A. 0.1
P
+ 0.3
Y
+ 0.1
Z
=
W/C
x
P
B. 0.3
P
+ 0.1
Y
+ 0.01
Z
=
W/C
x
P
C. 0.4
P
+ 0.2
Y
+ 0.01
Z
=
W/C
x
P
D. 0.5
P
+ 0.3
Y
+ 0.01
Z
=
W/C
x
P
E. 0.2
P
+ 0.5
Y
+ 0.1
Z
=
W/C
x
P
Show Answer
Scratch Pad
Discuss
Correct Answer: 0.3
P
+ 0.1
Y
+ 0.01
Z
=
W/C
x
P
9. Expansion joints are provided if the length of concrete structures exceeds
Options
A. 10 m
B. 15 m
C. 15 m
D. 35 m
E. 45 m
Show Answer
Scratch Pad
Discuss
Correct Answer: 45 m
10. According to IS : 382-1963, a good aggregate should be
Options
A. chemically inert
B. sufficiently strong
C. hard and durable
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
First
17
18
19
...
20
..
22
23
Last
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering