Suppose he moves 4 km downstream in H hrs.
Then, Speed downstream = 4/H km/hr
Speed upstream = 3/H km/hr
T1 + T2 = 14
? (48 x H)/4 + (48 x H)/3 = 14
? 12H + 16H = 14
? H = 1/2
? Speed downstream = 8 km/hr
Speed upstream = 6 km/hr
? Rate stream = (8 - 6)/2 km/hr = 1 km/hr
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.