Let the length of the train be L m.
According to the question,
L/9 = Speed ...(i)
and (L + 150)/15 = Speed ..(ii)
from Eqs. (i) and (ii) we get
L/9 = (L + 150)/15
? L/3 = (L + 150)/5
? 5L = 3L + 450
? L = 225 m
4th observation i.e., 8 is the median.
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.