Let the length of train be x meter and speed be y m/sec
Therefore, time taken to cross the pole = x/y sec
and time taken to cross the platform = ( Length of train + Length of platform) / speed of train
Therefore x/y = 10
And, (x+200) / y = 20
? 10y + 200 = 20 y
? speed of train, y = 20 m/sec
And length of rain = x = 10y = 200m
4th observation i.e., 8 is the median.
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.