Part filled by A in 1 min = 1/30
Part filled by B in 1 min = 1/10
Part emptied by C in 1 min = - 1/40
Net part filled in 1 h by ( A + B + C ) = ( 1/30 + 1/10 - 1/40 )
= (4 + 12 - 3)/120 = 13/120
? Required time to fill the tank = 120/13 = 93/13 h
4th observation i.e., 8 is the median.
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.