Efficiency of Kavita = 5%
Efficiency of Babita = 1.66%
Efficiency of Samita = 3.33%
Work done in 5 days by K + B + S = 5 x 10 = 50%
Work done in 3 days by K + B = 3 x 6.66 = 20%
Remaning work (30%) done by Kavita alone = 30/5 = 6 days
Let the length of each train = L metres
Relative speed = (46 - 36) = 10 km/hr. = 10 x (5/18) = 25/9 m/sec
Distance covered in crossing = (L + L) = 2L metres
? 2L x (9/25) = 36
? L = (25 x 36)/(2 x 9) = 50 metres.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.