Krishna's efficiency = 10%
Mohan's efficiency = 5%
Work done by Krishana and mohan together in 3 days = 15 x 3 = 45%
Now, number of days in which B completed rest (55%) work alone = 55/5 = 11
Total No. of days in which B worked = 3 + 11 = 14
Now No. of days required by B, when A and B both worked together = 100/15 = 62/3
? Required difference in No. of days = (11) - (62/3)
= 13/3 = 4 1/3 days
4th observation i.e., 8 is the median.
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38