Fraction of work complete by (A and B) + Fraction of work complete by (B and C) + Fraction of work completed by C = 1
As B did the work for 8 days we can say B did the work for 3 days with A and B did the work for 5 days with C. So, A and B together did the work for 3 days, B and C together did the work for 5 days, C alone did the work for 5 days.
? 3/12 + 5/15 + 5/x = 1 or 5/x = 5/12
i.e., x = 12 or C alone can complete the work in 12 days
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.