As per question, work of A for 1 day = 1/12 and work of B for 1 day = 1/8
? Work of (A + B) together for 1 day = 1/12 + 1/8 = (2 + 3)/24 = 5/24
? Work of (A + B) together for 3 days = 3 x (5/24) = 5/8
? Remaining work after 3 days = 1 - 5/8 = 3/8
? C can do the same work in = 4/5th time required by (A + B) = 4/5 x 24/5 = 96/25 days
? Work of C for 1 day = 25/96 part.
? 25/96 part work can be done by C in 1 day
? 3/8 part work can be done by C in = 96/25 x 3/8 days = 36/25 days = 111/25
? The complete day C did the work = 1 day.
4th observation i.e., 8 is the median.
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38