(A + B)'s 2 day's work = (1/12) + (1/18) = 5/36
(A + B)'s 14 day's work = (5/36) x 7 = 35/36
Remaining work = 1 - (35/36) = 1/36
Now, it is the turn of A .
A's 1 day's work = 1/12
? 1/36 work is done by A in 12 x (1/36) days = 1/3 days
? Total time taken = 141/3 days
The shaded region represents
y ? x
Let 45 x A = (25 x 900)/100
? A = (25 x 9)/45 = 5
CP = [100/(100 - Loss%) ] x SP
CP = 6000 x (100/75) = 8000
NA
Angle swept in 30 min= 180°
Area swept = [(22/7) x 7 x 7] x [180°/360°] cm2
= 77 cm2
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.