25 men reap the field in 20 days
? 10 men can reap the feild in (20 x 25)/ 10 = 50 days.
When 15 men leave the work, 10 men remain and they can reap in 371/2 days
= (371/2)/ 50 = 3/4 of the field
Hence, all men must work till (1 - 3/4) = 1/4 of the field is reaped in 20/4 = 5 days.
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.