(12 men + 16 boys) can do a work in 5 days.
(60 men + 80 boys) can do a work in 1 day.
(13 men + 24 boys) can do a work in 4 days.
(52 men + 96 boys) can do a work in 1 day.
? 60 men + 80 boys = 52 men + 96 boys
8 men = 16 boys and 1 man = 2 boys
Now, 12 men + 16 boys = (12 x 2 + 16) boys
= 40 boys can do the work in 5 days
? 5 men + 10 boys = [5 x 2 + 10] boys
= 20 boys will take
= (40 x 5)/20 = 10 days
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
NA
Each previous number is multiplied by 2.
? 8 m shadow means original height = 12 m
? 1 m shadow means original height = 12/8 m
? 100 m shadow means original height = (12/8) x 100 m
= (6/4) x 100 = 6 x 25 = 150 m
Let 8% of 96 = y of 1/25
? (8 x 96)/100 = y/25
? y = (8 x 96 x 25)/100 = 192
Since the principal is not given, so data is inadequate.