Efficiency of A = 100/24 = 4.16%
Efficiency of B = 100/30 = 3.33%
Efficiency of (A+ B+C) =100/12 = 8.33%
? Efficiency of C = (8.33) - (4.16 + 3.33) = 0.83%
? Number of days required by C to complete the work alone
= 100/0.83 = 100/(5/6) = 120 days
(Note : 5/6 = 0.833)
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
NA
Each previous number is multiplied by 2.
? 8 m shadow means original height = 12 m
? 1 m shadow means original height = 12/8 m
? 100 m shadow means original height = (12/8) x 100 m
= (6/4) x 100 = 6 x 25 = 150 m
Let 8% of 96 = y of 1/25
? (8 x 96)/100 = y/25
? y = (8 x 96 x 25)/100 = 192
Since the principal is not given, so data is inadequate.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.