P,s 1 day's work = 1/12
Q's 1 day's work = 1/8
(P + Q)'s 1 day's work = (1/12) + (1/8)
= (2 + 3)/24
= 5/24
(P + Q + R)'s 1 day's work = 1/4
? R's 1 day's work = (1/4) - (5/24) = (6 - 5)/24 = 1/24
? R will finish the work alone in 24 days.
? Required time = 24 days
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days