Let CP = N
Then, SP = 110N / 100 = ? 11N/10
Now, CP = 96% of N = 96N/100 = ? 24N/25
Now, according to the question,
SP = ? (11N/10) + 6
? (11N/10) + 6 = 1183/4% of 24N/25
? (11N + 60)/10 = (475/400) x (24N/25) = 57N/50
? 550N + 3000 = 570N
? 20N = 3000
? N = 3000/20 = 150
? CP = ? 150
4th observation i.e., 8 is the median.
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.