Let the cost price be ? N.
SP of 1 orange = ? 30/32 = ? 15/16
According to the question, 75N/100 = 15/16
? N = [(15 x 100)/75] x 16 = ? 5/4
SP of 1 orange with 20% profit = ? [(5/4) x 120]/100 = ? 3/2
? In ? 3/2, the number of oranges sold = 1
? in ? 24, the number of oranges sold = (2/3) x 24 = 16
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
NA
Each previous number is multiplied by 2.
? 8 m shadow means original height = 12 m
? 1 m shadow means original height = 12/8 m
? 100 m shadow means original height = (12/8) x 100 m
= (6/4) x 100 = 6 x 25 = 150 m
Let 8% of 96 = y of 1/25
? (8 x 96)/100 = y/25
? y = (8 x 96 x 25)/100 = 192
Since the principal is not given, so data is inadequate.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.