Let S.P. of T.V. (by trader) = Rs. 100
If S.P. is Rs. 80, then M.P. = Rs. 100
If S.P. is Rs. 100, M.P. = Rs. (100 / 80) x 100 = Rs. 125
Now, if discount is 25% then, S.P. = (75% of Rs. 125) = Rs. 375/4
Difference between two S.P. = Rs. (100 - 375/4) = Rs. 25 / 4
If difference is Rs. 25/4, S.P. = Rs. 100
If difference is Rs. 500, S.P. = Rs.(100 x 4 ) / (25 x 500) = Rs. 8000
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
NA
Each previous number is multiplied by 2.
? 8 m shadow means original height = 12 m
? 1 m shadow means original height = 12/8 m
? 100 m shadow means original height = (12/8) x 100 m
= (6/4) x 100 = 6 x 25 = 150 m
Let 8% of 96 = y of 1/25
? (8 x 96)/100 = y/25
? y = (8 x 96 x 25)/100 = 192
Since the principal is not given, so data is inadequate.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.