  • Question
  • A fort had provision of food for 150 men for 45 days. After 10 days, 25 men left the fort. The number of days for which the remaining food will last, is:


  • Options
  • A. 39
  • B. 37
  • C. 42
  • D. 56

  • Correct Answer
  • 42 

    Explanation

    As per the given question ,
    Food of 150 men for 45 days = 150 × 45 = 6750 unit
    After 10 days , Food of 150 men for 150 × 10 = 1500 unit
    And after 10 days remaining men = 150 - 25 = 125
    and remaining food = 6750 - 1500 = 5250 unit
    Let D be the number of days for which the remaining food .
    So, 125 × D = 5250
    ? D = 5250 /125 = 42 days


  • Unitary Method problems


    Search Results


    • 1. 
      Nine examiners can examine a certain number of answer books in 12 days by working 5 hours a day. How many hours in a day should 4 examiners work to examine twice the number of answer books in 30 days?

    • Options
    • A. 9
    • B. 11
    • C. 13
    • D. 17
    • Discuss
    • 2. 
      10 men, working 6 hours a day can complete a work in 18 days. How many hours a day must 15 men work to complete the work in 12 days?

    • Options
    • A. 4
    • B. 3
    • C. 6
    • D. 8
    • Discuss
    • 3. 
      In a camp, there is a meal for 120 men or 200 children. If 150 children have taken the meal, how many men will be catered to with remaining meal?

    • Options
    • A. 56
    • B. 45
    • C. 30
    • D. 27
    • Discuss
    • 4. 
      'P' men working 'P' hours per day can do 'P' units of a work in 'P' days. How much work can be completed by 'Q' men working 'Q' hours per day in 'Q' days?

    • Options
    • A. P2Q2 units
    • B. Q3/P2 units
    • C. P2Q
    • D. Q2P2 units
    • Discuss
    • 5. 
      A contract is to be completed in 56 days if 104 persons work, each working at 8 hours a day. After 30 days, 25 % of the work is completed. How many additional persons should be deployed so that the work will be completed in the scheduled time, each person now working 9 hours a day.

    • Options
    • A. 60
    • B. 58
    • C. 12
    • D. 56
    • Discuss
    • 6. 
      Nine engines consume 24 metric tonnes of coal, when each is working 8 hours day. How much coal is required for 8 engines, each running 13 hours a day, if 3 engines of former type consume as much as 4 engines of latter type?

    • Options
    • A. 20 metric tonnes
    • B. 39 metric tonnes
    • C. 23 metric tonnes
    • D. 26 metric tonnes
    • Discuss
    • 7. 
      If 40 men can make 30 boxes in 20 days, How many more men are needed to make 60 boxes in 25 days?

    • Options
    • A. 20
    • B. 24
    • C. 27
    • D. 28
    • Discuss
    • 8. 
      2 men and 7 boys can do a piece of work in 14 days; 3 men and 8 boys can do the same in 11 days. Then, 8 men and 6 boys can do three times the amount of this work in.

    • Options
    • A. 18
    • B. 21
    • C. 34
    • D. 39
    • Discuss
    • 9. 
      If 20 men can build a wall 56 meters long in 6 days , what length of a similar wall can be built by 35 men in 3 days?

    • Options
    • A. 40
    • B. 43
    • C. 48
    • D. 49
    • Discuss
    • 10. 
      A wheel that has 6 cogs is meshed with a larger wheel of 14 cogs. When the smaller wheel has made 21 revolutions, then the number of revolutions made by the larger wheel is:

    • Options
    • A. 4
    • B. 9
    • C. 14
    • D. 7
    • Discuss