? 8 m shadow means original height = 12 m
? 1 m shadow means original height = 12/8 m
? 100 m shadow means original height = (12/8) x 100 m
= (6/4) x 100 = 6 x 25 = 150 m
? Distance covered in 20 min = 5 km
? Distance covered in 1 min = 5/20 km
? Distance covered in 100 min = (5/20) x 100
= 5 x 5 = 25 km
Let the required weight be w kg.
Less length, Less weight (Direct proportion)
45 : 12 :: 171 : w
? w = (12 x 171)/45 = 45.6 kg
Let number of toys be N.
More hours, More toys (Direct proportion)
2 : 80 : : 1 : N
? N = 80/2 = 40 toys
Let the required number of bananas be N.
16 dozens bananas = 16 x 12 = 192 bananas
Less bananas, Less cost (Direct proportion)
360 : 60 : : 192 : N
? N = (60 x 192)/360 = 32 bananas
? Cost of 15 eggs = ? 75
? Cost of 1 egg = ? 75/15
? Cost of 4 dozens (4 x 12) = Cost of 48 eggs
= (75/15) x 48 = ? 240
Cost of x meters ropes = Rs. d
? Cost of 1 meters ropes = Rs. d /x
? Cost of y meters ropes = Rs. dy/x
40 cows eat 40 bags of husk in 40 days.
? 1 cows eat 40 bags of husk in 40 x 40 days.
? 1 cows eat 1 bags of husk in 40 x 40 / 40 days.
? 1 cows eat 1 bags of husk in 40 days.
15 Cows eat as much as 21 Goats.
? 1 Cows eat as much as 21/ 15 Goats.
? 35 Cows eat as much as 21 x 35 / 15 Goats.
? 35 Cows eat as much as 21 x 7 / 3 Goats.
? 35 Cows eat as much as 7 x 7 Goats.
? 35 Cows eat as much as 49 Goats.
Since 39 persons can repair a road by working 5 hours in a day in 12 days.
? 1 persons can repair a road by working 5 hours in a day in 39 x 12 days.
? 1 persons can repair a road by working 1 hours in a day in 39 x 12 x 5 days.
? 30 persons can repair a road by working 1 hours in a day in 39 x 12 x 5 / 30 days.
? 30 persons can repair a road by working 6 hours in a day in 39 x 12 x 5 / 30 x 6 days.
? 30 persons can repair a road by working 6 hours in a day in 39 x 2 x 1 / 6 days.
? 30 persons can repair a road by working 6 hours in a day in 39 x 1 x 1 / 3 days.
? 30 persons can repair a road by working 6 hours in a day in 13 days.
4 mat-weavers in 4 days can weave 4 mats.
1 mat-weavers in 4 days can weave 4 / 4 mats.
1 mat-weavers in 1 days can weave 4 / 4 x 4 mats.
8 mat-weavers in 1 days can weave 4 x 8 / 4 x 4 mats.
8 mat-weavers in 8 days can weave 4 x 8 x 8 / 4 x 4 mats.
8 mat-weavers in 8 days can weave 4 x 2 x 2 mats.
8 mat-weavers in 8 days can weave 16 mats.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.