Capacity of flight conveyor in tons/hr is given by (where, W & D = width and depth of flight respectively in metre V = speed of the conveyor, metre/second ? = bulk density of material, kg/m3)
Options
A. 3.6 W.D.V.?
B. 3.6 W.D.V.
C. 3.6 W.V.?
D. 3.6 D.V.?
Correct Answer
3.6 W.D.V.?