A point load of 700 kN is applied on the surface of thick layer of clay. Using Boussinesq's elastic analysis, the estimated vertical stress (?v) at a depth of 2 m and a radial distance of 1.0 m from the point of application of the load, is :
2. The time for a clay layer to achieve 90% consolidation is 15 years. The time required to achieve 90% consolidation; if the layer were twice as thick, 3 times forr permeable and 4 times more compressible would be :
3. The ratio of unconfined compressive strength of an undisturbed sample of soil to that of a remoulded sample, at the same water content, is known as :
4. A linear relationship is observed between speed and density on a certain section of a highway. The free flow speed is observed to be 80 km per hour and the jam density is estimated as 100 vehicles per km length. Based on the above relationship, the maximum flow expected on this section and the speed at the maximum flow will respectively be
10. For an anisotropic soil, permeabilities in x and y directions are kx and ky respectively in a two dimensional flow. The effective permeability keq for the soil is given by