CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Mechanical Engineering
‣
Industrial Engineering and Production Management
Comments
Question
The interchangeability can be achieved by
Options
A. standardisation
B. better process planning
C. bonus plan
D. better product planning
Correct Answer
standardisation
Industrial Engineering and Production Management problems
Search Results
1. The most suitableincentive plan for the maintenance section of an industry will be
Options
A. piece rate system
B. group incentive plan
C. profit sharing plans
D. simplification
Show Answer
Scratch Pad
Discuss
Correct Answer: group incentive plan
2. For handling materials during manufacture of cement, a __________ is widely used.
Options
A. belt conveyor
B. bucket conveyor
C. fork lift truck
D. overhead crane
Show Answer
Scratch Pad
Discuss
Correct Answer: bucket conveyor
3. CPM requires
Options
A. single time estimate
B. double time estimate
C. triple time estimate
D. none of these
Show Answer
Scratch Pad
Discuss
Correct Answer: single time estimate
4. Which one of the following techniques is used for determining allowances in time study?
Options
A. Acceptance sampling
B. Linear regression
C. Performance rating
D. Work sampling
Show Answer
Scratch Pad
Discuss
Correct Answer: Work sampling
5. PERT
Options
A. provides an approach for keeping planning up-to-date
B. provides a way for management to require that planning be done on a uniform and logical basis
C. permits management to foresee quickly the impact of variations from the plan
D. all of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: all of the above
6. Which of the following wage incentive plan is applied to all workers?
Options
A. Halsey plan
B. Gantt plan
C. Emerson's efficiency plan
D. Rowan plan
Show Answer
Scratch Pad
Discuss
Correct Answer: Halsey plan
7. Process layout is also known as
Options
A. analyticallayout
B. synthetic layout
C. static product layout
D. none of these
Show Answer
Scratch Pad
Discuss
Correct Answer: analyticallayout
8. Actual performance of a task is called
Options
A. an event
B. an activity
C. a duration
D. none of these
Show Answer
Scratch Pad
Discuss
Correct Answer: an activity
9. PERT is a project planning and control technique.
Options
A. Yes
B. No
Show Answer
Scratch Pad
Discuss
Correct Answer: Yes
10. In a simple bending theory, one of the assumption is that the material of the beam is isotropic. This assumption means that the
Options
A. normal stress remains constant in all directions
B. normal stress varies linearly in the material
C. elastic constants are same in all the directions
D. elastic constants varies linearly in the material
Show Answer
Scratch Pad
Discuss
Correct Answer: elastic constants are same in all the directions
Comments
There are no comments.
Enter a new Comment
Save
More in Mechanical Engineering:
Automobile Engineering
Compressors, Gas Dynamics and Gas Turbines
Engineering Materials
Engineering Mechanics
Heat Transfer, Refrigeration and Air Conditioning
Hydraulic Machines
Hydraulics and Fluid Mechanics
IC Engines and Nuclear Power Plants
Industrial Engineering and Production Management
Machine Design
Production Engineering
Steam Boilers and Engines
Steam Nozzles and Turbines
Strength of Materials
Theory of machines
Thermodynamics
Workshop Technology