  • Question
  • For handling materials during manufacture of cement, a __________ is widely used.


  • Options
  • A. belt conveyor
  • B. bucket conveyor
  • C. fork lift truck
  • D. overhead crane

  • Correct Answer
  • bucket conveyor 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. CPM requires

    • Options
    • A. single time estimate
    • B. double time estimate
    • C. triple time estimate
    • D. none of these
    • Discuss
    • 2. Which one of the following techniques is used for determining allowances in time study?

    • Options
    • A. Acceptance sampling
    • B. Linear regression
    • C. Performance rating
    • D. Work sampling
    • Discuss
    • 3. PERT

    • Options
    • A. provides an approach for keeping planning up-to-date
    • B. provides a way for management to require that planning be done on a uniform and logical basis
    • C. permits management to foresee quickly the impact of variations from the plan
    • D. all of the above
    • Discuss
    • 4. The value engineering technique in which experts of the same rank assemble for product development is called

    • Options
    • A. Delphi
    • B. brain storming
    • C. morphological analysis
    • D. direct expert comparison
    • Discuss
    • 5. Linear programming can be applied successfully to

    • Options
    • A. chemical industry
    • B. oil industry
    • C. banks
    • D. all of these
    • Discuss
    • 6. The most suitableincentive plan for the maintenance section of an industry will be

    • Options
    • A. piece rate system
    • B. group incentive plan
    • C. profit sharing plans
    • D. simplification
    • Discuss
    • 7. The interchangeability can be achieved by

    • Options
    • A. standardisation
    • B. better process planning
    • C. bonus plan
    • D. better product planning
    • Discuss
    • 8. Which of the following wage incentive plan is applied to all workers?

    • Options
    • A. Halsey plan
    • B. Gantt plan
    • C. Emerson's efficiency plan
    • D. Rowan plan
    • Discuss
    • 9. Process layout is also known as

    • Options
    • A. analyticallayout
    • B. synthetic layout
    • C. static product layout
    • D. none of these
    • Discuss
    • 10. Actual performance of a task is called

    • Options
    • A. an event
    • B. an activity
    • C. a duration
    • D. none of these
    • Discuss