  • The time taken by a trained worker to perform an operation, while working a steady pace, is known as


  • Options
  • A. standard time
  • B. normal time
  • C. representative time
  • D. none of these

  • Correct Answer
  • standard time 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. In fixed position layout

    • Options
    • A. total production cost is less
    • B. material movement is less
    • C. capital investment is minimum
    • D. all of these
    • Discuss
    • 2. Product layout is also known as

    • Options
    • A. analytical layout
    • B. synthetic layout
    • C. static product layout
    • D. none of these
    • Discuss
    • 3. Product layout is used for

    • Options
    • A. job production
    • B. batch production
    • C. mass production
    • D. any one of these
    • Discuss
    • 4. If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Halsey 50-50 plan, wages for the job will be

    • Options
    • A. TR
    • B.
    • C. TR + (S - T)R
    • D.
    • Discuss
    • 5. According to Muther, the basic principle of best layout is

    • Options
    • A. principle of over-all integration
    • B. principle of flow
    • C. principle of flexibility
    • D. all of these
    • Discuss
    • 6. In product layout

    • Options
    • A. specialised and strict supervision is required
    • B. machines can not be used to their maximum capacity
    • C. manufacturing cost rises with a fall in the volume of production
    • D. all of the above
    • Discuss
    • 7. Normal time is the ratio of representative time to the rating factor.

    • Options
    • A. True
    • B. False
    • Discuss
    • 8. An activity of the project is graphically represented by __________ on the network diagram.

    • Options
    • A. a circle
    • B. a straight line
    • C. an arrow
    • Discuss
    • 9. Process layout is employed

    • Options
    • A. where low volume of production is required
    • B. where similar jobs are manufactured on similar machines
    • C. where machines are arranged on functional basis
    • D. all of the above
    • Discuss
    • 10. Halsey plan of wage incentive

    • Options
    • A. is not applied to all level of workers
    • B. is applied to all level of workers
    • C. does not guarantee minimum wage
    • D. is based upon efficiency of worker