logo

CuriousTab

CuriousTab

Discussion


Home Mechanical Engineering Industrial Engineering and Production Management Comments

  • Question
  • Product layout is used for


  • Options
  • A. job production
  • B. batch production
  • C. mass production
  • D. any one of these

  • Correct Answer
  • mass production 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Halsey 50-50 plan, wages for the job will be

    • Options
    • A. TR
    • B.
    • C. TR + (S - T)R
    • D.
    • Discuss
    • 2. According to Muther, the basic principle of best layout is

    • Options
    • A. principle of over-all integration
    • B. principle of flow
    • C. principle of flexibility
    • D. all of these
    • Discuss
    • 3. Break even analysis represents the relationship between cost and volume.

    • Options
    • A. True
    • B. False
    • Discuss
    • 4. Work study is mainly aimed at

    • Options
    • A. determining the most efficient method of performing a job
    • B. establishing the minimum time of completion of a job
    • C. developing the standard method and standard time of a job
    • D. economising the motions involved on the part of the worker while performing a job
    • Discuss
    • 5. P.M.T.S. (Predetermined Motion Time Systems) include

    • Options
    • A. M.T.M. (Method Time Measurement)
    • B. W.F.S. (Work Factor Systems)
    • C. B.M.T.S. (Basic Motion Time Study)
    • D. all of these
    • Discuss
    • 6. Product layout is also known as

    • Options
    • A. analytical layout
    • B. synthetic layout
    • C. static product layout
    • D. none of these
    • Discuss
    • 7. In fixed position layout

    • Options
    • A. total production cost is less
    • B. material movement is less
    • C. capital investment is minimum
    • D. all of these
    • Discuss
    • 8. The time taken by a trained worker to perform an operation, while working a steady pace, is known as

    • Options
    • A. standard time
    • B. normal time
    • C. representative time
    • D. none of these
    • Discuss
    • 9. In product layout

    • Options
    • A. specialised and strict supervision is required
    • B. machines can not be used to their maximum capacity
    • C. manufacturing cost rises with a fall in the volume of production
    • D. all of the above
    • Discuss
    • 10. Normal time is the ratio of representative time to the rating factor.

    • Options
    • A. True
    • B. False
    • Discuss


    Comments

    There are no comments.

Enter a new Comment