Home Mechanical Engineering Industrial Engineering and Production Management Comments

  • Question
  • Work study is mainly aimed at


  • Options
  • A. determining the most efficient method of performing a job
  • B. establishing the minimum time of completion of a job
  • C. developing the standard method and standard time of a job
  • D. economising the motions involved on the part of the worker while performing a job

  • Correct Answer
  • determining the most efficient method of performing a job 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. P.M.T.S. (Predetermined Motion Time Systems) include

    • Options
    • A. M.T.M. (Method Time Measurement)
    • B. W.F.S. (Work Factor Systems)
    • C. B.M.T.S. (Basic Motion Time Study)
    • D. all of these
    • Discuss
    • 2. The type of organisation preferred for an automobile industry, is

    • Options
    • A. line organisation
    • B. functional organisation
    • C. line and staff organisation
    • D. line, staff and functional organisation
    • Discuss
    • 3. Which of the following charts are used for plant layout design?

    • Options
    • A. Operation process chart
    • B. Man machine chart
    • C. Travel chart
    • D. all of these
    • Discuss
    • 4. Performance rating is equal to

    • Options
    • A. observed performance + normal performance
    • B. observed performance - normal performance
    • C. observed performance x normal performance
    • D. none of the above
    • Discuss
    • 5. A company spends considerable amount on publicity to promote sales. This expenditure in break even chart is shown below the

    • Options
    • A. fixed cost line
    • B. variable cost line
    • C. total cost line
    • D. sales revenue line
    • Discuss
    • 6. Break even analysis represents the relationship between cost and volume.

    • Options
    • A. True
    • B. False
    • Discuss
    • 7. According to Muther, the basic principle of best layout is

    • Options
    • A. principle of over-all integration
    • B. principle of flow
    • C. principle of flexibility
    • D. all of these
    • Discuss
    • 8. If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Halsey 50-50 plan, wages for the job will be

    • Options
    • A. TR
    • B.
    • C. TR + (S - T)R
    • D.
    • Discuss
    • 9. Product layout is used for

    • Options
    • A. job production
    • B. batch production
    • C. mass production
    • D. any one of these
    • Discuss
    • 10. Product layout is also known as

    • Options
    • A. analytical layout
    • B. synthetic layout
    • C. static product layout
    • D. none of these
    • Discuss