  • Abbreviated work factor data is applied for


  • Options
  • A. material handling operation
  • B. maintenance operation
  • C. packing and shipping operation
  • D. all of these

  • Correct Answer
  • all of these 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. The process capability of a machine is defined as the capability of the machine to

    • Options
    • A. produce a definite volume of work per minute
    • B. perform definite number of operations
    • C. produce job at a definite spectrum of speed
    • D. hold a definite spectrum of tolerance and surface finish
    • Discuss
    • 2. The start or completion of task is called

    • Options
    • A. an event
    • B. an activity
    • C. a duration
    • D. none of these
    • Discuss
    • 3. The factors which are to be considered while developing a good wage incentive plan will include

    • Options
    • A. adequate incentive
    • B. ease of administration
    • C. guaranteed basic pay
    • D. all of these
    • Discuss
    • 4. Monte Carlo solution in queuing theory is extremely useful in queuing problems that can not be analysed mathematically.

    • Options
    • A. Agree
    • B. Disagree
    • Discuss
    • 5. PERT is applied for

    • Options
    • A. marketing programmes and advertising programmes
    • B. installation of machinery
    • C. research and development of products
    • D. all of these
    • Discuss
    • 6. A company spends considerable amount on publicity to promote sales. This expenditure in break even chart is shown below the

    • Options
    • A. fixed cost line
    • B. variable cost line
    • C. total cost line
    • D. sales revenue line
    • Discuss
    • 7. Performance rating is equal to

    • Options
    • A. observed performance + normal performance
    • B. observed performance - normal performance
    • C. observed performance x normal performance
    • D. none of the above
    • Discuss
    • 8. Which of the following charts are used for plant layout design?

    • Options
    • A. Operation process chart
    • B. Man machine chart
    • C. Travel chart
    • D. all of these
    • Discuss
    • 9. The type of organisation preferred for an automobile industry, is

    • Options
    • A. line organisation
    • B. functional organisation
    • C. line and staff organisation
    • D. line, staff and functional organisation
    • Discuss
    • 10. P.M.T.S. (Predetermined Motion Time Systems) include

    • Options
    • A. M.T.M. (Method Time Measurement)
    • B. W.F.S. (Work Factor Systems)
    • C. B.M.T.S. (Basic Motion Time Study)
    • D. all of these