CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Mechanical Engineering
‣
Industrial Engineering and Production Management
Comments
Question
The factors which are to be considered while developing a good wage incentive plan will include
Options
A. adequate incentive
B. ease of administration
C. guaranteed basic pay
D. all of these
Correct Answer
all of these
Industrial Engineering and Production Management problems
Search Results
1. Monte Carlo solution in queuing theory is extremely useful in queuing problems that can not be analysed mathematically.
Options
A. Agree
B. Disagree
Show Answer
Scratch Pad
Discuss
Correct Answer: Agree
2. PERT is applied for
Options
A. marketing programmes and advertising programmes
B. installation of machinery
C. research and development of products
D. all of these
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these
3. Time study is used to
Options
A. determine standard costs
B. determine the number of machines a person may run
C. provide a basis for setting piece price or incentive wages
D. all of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: all of the above
4. Service time in queuing theory is usually assumed to follow
Options
A. normal distribution
B. Poissons distribution
C. Erlang distribution
D. exponential law
Show Answer
Scratch Pad
Discuss
Correct Answer: exponential law
5. Generally PERT is preferred over CPM for the purpose of project evaluation.
Options
A. Yes
B. No
Show Answer
Scratch Pad
Discuss
Correct Answer: Yes
6. The start or completion of task is called
Options
A. an event
B. an activity
C. a duration
D. none of these
Show Answer
Scratch Pad
Discuss
Correct Answer: an event
7. The process capability of a machine is defined as the capability of the machine to
Options
A. produce a definite volume of work per minute
B. perform definite number of operations
C. produce job at a definite spectrum of speed
D. hold a definite spectrum of tolerance and surface finish
Show Answer
Scratch Pad
Discuss
Correct Answer: produce a definite volume of work per minute
8. Abbreviated work factor data is applied for
Options
A. material handling operation
B. maintenance operation
C. packing and shipping operation
D. all of these
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these
9. A company spends considerable amount on publicity to promote sales. This expenditure in break even chart is shown below the
Options
A. fixed cost line
B. variable cost line
C. total cost line
D. sales revenue line
Show Answer
Scratch Pad
Discuss
Correct Answer: variable cost line
10. Performance rating is equal to
Options
A. observed performance + normal performance
B. observed performance - normal performance
C. observed performance x normal performance
D. none of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: none of the above
Comments
There are no comments.
Enter a new Comment
Save
More in Mechanical Engineering:
Automobile Engineering
Compressors, Gas Dynamics and Gas Turbines
Engineering Materials
Engineering Mechanics
Heat Transfer, Refrigeration and Air Conditioning
Hydraulic Machines
Hydraulics and Fluid Mechanics
IC Engines and Nuclear Power Plants
Industrial Engineering and Production Management
Machine Design
Production Engineering
Steam Boilers and Engines
Steam Nozzles and Turbines
Strength of Materials
Theory of machines
Thermodynamics
Workshop Technology