  • Question
  • Time study is used to


  • Options
  • A. determine standard costs
  • B. determine the number of machines a person may run
  • C. provide a basis for setting piece price or incentive wages
  • D. all of the above

  • Correct Answer
  • all of the above 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. Service time in queuing theory is usually assumed to follow

    • Options
    • A. normal distribution
    • B. Poissons distribution
    • C. Erlang distribution
    • D. exponential law
    • Discuss
    • 2. Generally PERT is preferred over CPM for the purpose of project evaluation.

    • Options
    • A. Yes
    • B. No
    • Discuss
    • 3. A feasible solution to the linear programming problem should

    • Options
    • A. satisfy the problem constraints
    • B. optimise the objective function
    • C. satisfy the problem constraints and non-negativity restrictions
    • D. satisfy the non-negativity restrictions
    • Discuss
    • 4. The most important function of inventory control is

    • Options
    • A. stock control system
    • B. to run the stores effectively
    • C. technical responsibility for the state of materials
    • D. all of the above
    • Discuss
    • 5. In process layout

    • Options
    • A. handling and back-tracking of materials is too much
    • B. production control is more difficult and costly
    • C. routing and scheduling is more difficult
    • D. all of the above
    • Discuss
    • 6. PERT is applied for

    • Options
    • A. marketing programmes and advertising programmes
    • B. installation of machinery
    • C. research and development of products
    • D. all of these
    • Discuss
    • 7. Monte Carlo solution in queuing theory is extremely useful in queuing problems that can not be analysed mathematically.

    • Options
    • A. Agree
    • B. Disagree
    • Discuss
    • 8. The factors which are to be considered while developing a good wage incentive plan will include

    • Options
    • A. adequate incentive
    • B. ease of administration
    • C. guaranteed basic pay
    • D. all of these
    • Discuss
    • 9. The start or completion of task is called

    • Options
    • A. an event
    • B. an activity
    • C. a duration
    • D. none of these
    • Discuss
    • 10. The process capability of a machine is defined as the capability of the machine to

    • Options
    • A. produce a definite volume of work per minute
    • B. perform definite number of operations
    • C. produce job at a definite spectrum of speed
    • D. hold a definite spectrum of tolerance and surface finish
    • Discuss