logo

CuriousTab

CuriousTab

Discussion


Home Mechanical Engineering Industrial Engineering and Production Management Comments

  • Question
  • In jobbing production


  • Options
  • A. highly skilled workers are needed
  • B. unit costs are high
  • C. operations are labour-intensive
  • D. all of these

  • Correct Answer
  • all of these 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. In time study, normal time is more than the standard time.

    • Options
    • A. Yes
    • B. No
    • Discuss
    • 2. Routing

    • Options
    • A. prescribes the sequence of operations to be followed
    • B. determines the programme for the operations
    • C. is concerned with starting of processes
    • D. regulates the progress of job through various processes
    • Discuss
    • 3. Which of the following statement is correct about the network diagram?

    • Options
    • A. The events are represented graphically by circles or nodes at the beginning and the end of activity by arrows.
    • B. The tail end of the arrow represents the start of an activity.
    • C. The head of the arrow represents the end of an activity.
    • D. all of the above
    • Discuss
    • 4. The production cost per unit can be reduced by

    • Options
    • A. producing more with increased inputs
    • B. producing more with the same inputs
    • C. eliminating idle time
    • D. minimising resource waste
    • Discuss
    • 5. At the break even point,

    • Options
    • A. total cost is more than the sales revenue
    • B. total cost is less than the sales revenue
    • C. total cost is equal to sales revenue
    • D. fixed cost is equal to variable cost
    • Discuss
    • 6. Slack may be positive, zero or negative.

    • Options
    • A. Agree
    • B. Disagree
    • Discuss
    • 7. Earliest finish time can be regarded as

    • Options
    • A. earliest start time + duration of activity
    • B. earliest start time - duration of activity
    • C. latest finish time + duration of activity
    • D. latest finish time - duration of activity
    • Discuss
    • 8. In manufacturing management, the term 'Dispatching' is used to describe

    • Options
    • A. dispatch of sales order
    • B. dispatch of factory mail
    • C. dispatch of finished product of the user
    • D. dispatch of work orders through shop floor
    • Discuss
    • 9. Time study is carried out to determine the time required to complete job by

    • Options
    • A. a slow worker
    • B. a fast worker
    • C. an average worker
    • D. an apprentice
    • Discuss
    • 10. A dummy activity becomes a critical activity when its earliest start time (EST) is same as its latest finishing time (LFT).

    • Options
    • A. Correct
    • B. Incorrect
    • Discuss


    Comments

    There are no comments.

Enter a new Comment