CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Mechanical Engineering
‣
Industrial Engineering and Production Management
Comments
Question
In time study, normal time is more than the standard time.
Options
A. Yes
B. No
Correct Answer
No
Industrial Engineering and Production Management problems
Search Results
1. Routing
Options
A. prescribes the sequence of operations to be followed
B. determines the programme for the operations
C. is concerned with starting of processes
D. regulates the progress of job through various processes
Show Answer
Scratch Pad
Discuss
Correct Answer: prescribes the sequence of operations to be followed
2. Which of the following statement is correct about the network diagram?
Options
A. The events are represented graphically by circles or nodes at the beginning and the end of activity by arrows.
B. The tail end of the arrow represents the start of an activity.
C. The head of the arrow represents the end of an activity.
D. all of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: all of the above
3. The production cost per unit can be reduced by
Options
A. producing more with increased inputs
B. producing more with the same inputs
C. eliminating idle time
D. minimising resource waste
Show Answer
Scratch Pad
Discuss
Correct Answer: producing more with the same inputs
4. At the break even point,
Options
A. total cost is more than the sales revenue
B. total cost is less than the sales revenue
C. total cost is equal to sales revenue
D. fixed cost is equal to variable cost
Show Answer
Scratch Pad
Discuss
Correct Answer: total cost is equal to sales revenue
5. Which of the following conditions are necessary for applying linear programming?
Options
A. These must be a well defined objective function.
B. The decision variables should be interrelated and non-negative.
C. The resources must be in limited supply.
D. all of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: all of the above
6. In jobbing production
Options
A. highly skilled workers are needed
B. unit costs are high
C. operations are labour-intensive
D. all of these
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these
7. Slack may be positive, zero or negative.
Options
A. Agree
B. Disagree
Show Answer
Scratch Pad
Discuss
Correct Answer: Agree
8. Earliest finish time can be regarded as
Options
A. earliest start time + duration of activity
B. earliest start time - duration of activity
C. latest finish time + duration of activity
D. latest finish time - duration of activity
Show Answer
Scratch Pad
Discuss
Correct Answer: earliest start time + duration of activity
9. In manufacturing management, the term 'Dispatching' is used to describe
Options
A. dispatch of sales order
B. dispatch of factory mail
C. dispatch of finished product of the user
D. dispatch of work orders through shop floor
Show Answer
Scratch Pad
Discuss
Correct Answer: dispatch of work orders through shop floor
10. Time study is carried out to determine the time required to complete job by
Options
A. a slow worker
B. a fast worker
C. an average worker
D. an apprentice
Show Answer
Scratch Pad
Discuss
Correct Answer: an average worker
Comments
There are no comments.
Enter a new Comment
Save
More in Mechanical Engineering:
Automobile Engineering
Compressors, Gas Dynamics and Gas Turbines
Engineering Materials
Engineering Mechanics
Heat Transfer, Refrigeration and Air Conditioning
Hydraulic Machines
Hydraulics and Fluid Mechanics
IC Engines and Nuclear Power Plants
Industrial Engineering and Production Management
Machine Design
Production Engineering
Steam Boilers and Engines
Steam Nozzles and Turbines
Strength of Materials
Theory of machines
Thermodynamics
Workshop Technology