  • A. prescribes the sequence of operations to be followed
  • B. determines the programme for the operations
  • C. is concerned with starting of processes
  • D. regulates the progress of job through various processes

  • Correct Answer
  • prescribes the sequence of operations to be followed 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. Which of the following statement is correct about the network diagram?

    • Options
    • A. The events are represented graphically by circles or nodes at the beginning and the end of activity by arrows.
    • B. The tail end of the arrow represents the start of an activity.
    • C. The head of the arrow represents the end of an activity.
    • D. all of the above
    • Discuss
    • 2. The production cost per unit can be reduced by

    • Options
    • A. producing more with increased inputs
    • B. producing more with the same inputs
    • C. eliminating idle time
    • D. minimising resource waste
    • Discuss
    • 3. At the break even point,

    • Options
    • A. total cost is more than the sales revenue
    • B. total cost is less than the sales revenue
    • C. total cost is equal to sales revenue
    • D. fixed cost is equal to variable cost
    • Discuss
    • 4. Which of the following conditions are necessary for applying linear programming?

    • Options
    • A. These must be a well defined objective function.
    • B. The decision variables should be interrelated and non-negative.
    • C. The resources must be in limited supply.
    • D. all of the above
    • Discuss
    • 5. In perpetual inventory control, the material is checked as it reaches its

    • Options
    • A. maximum value
    • B. minimum value
    • C. average value
    • D. any one of these
    • Discuss
    • 6. In time study, normal time is more than the standard time.

    • Options
    • A. Yes
    • B. No
    • Discuss
    • 7. In jobbing production

    • Options
    • A. highly skilled workers are needed
    • B. unit costs are high
    • C. operations are labour-intensive
    • D. all of these
    • Discuss
    • 8. Slack may be positive, zero or negative.

    • Options
    • A. Agree
    • B. Disagree
    • Discuss
    • 9. Earliest finish time can be regarded as

    • Options
    • A. earliest start time + duration of activity
    • B. earliest start time - duration of activity
    • C. latest finish time + duration of activity
    • D. latest finish time - duration of activity
    • Discuss
    • 10. In manufacturing management, the term 'Dispatching' is used to describe

    • Options
    • A. dispatch of sales order
    • B. dispatch of factory mail
    • C. dispatch of finished product of the user
    • D. dispatch of work orders through shop floor