  • Question
  • The production cost per unit can be reduced by


  • Options
  • A. producing more with increased inputs
  • B. producing more with the same inputs
  • C. eliminating idle time
  • D. minimising resource waste

  • Correct Answer
  • producing more with the same inputs 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. At the break even point,

    • Options
    • A. total cost is more than the sales revenue
    • B. total cost is less than the sales revenue
    • C. total cost is equal to sales revenue
    • D. fixed cost is equal to variable cost
    • Discuss
    • 2. Which of the following conditions are necessary for applying linear programming?

    • Options
    • A. These must be a well defined objective function.
    • B. The decision variables should be interrelated and non-negative.
    • C. The resources must be in limited supply.
    • D. all of the above
    • Discuss
    • 3. In perpetual inventory control, the material is checked as it reaches its

    • Options
    • A. maximum value
    • B. minimum value
    • C. average value
    • D. any one of these
    • Discuss
    • 4. Indirect expenses include

    • Options
    • A. factory expenses
    • B. selling expenses
    • C. administrative expenses
    • D. all of these
    • Discuss
    • 5. According to Rowan plan of wage incentive system, bonus is paid to a worker

    • Options
    • A. whose output exceeds 67% efficiency
    • B. on the percentage of time saved
    • C. on the percentage of time worked
    • D. on the percentage of standard time
    • Discuss
    • 6. Which of the following statement is correct about the network diagram?

    • Options
    • A. The events are represented graphically by circles or nodes at the beginning and the end of activity by arrows.
    • B. The tail end of the arrow represents the start of an activity.
    • C. The head of the arrow represents the end of an activity.
    • D. all of the above
    • Discuss
    • 7. Routing

    • Options
    • A. prescribes the sequence of operations to be followed
    • B. determines the programme for the operations
    • C. is concerned with starting of processes
    • D. regulates the progress of job through various processes
    • Discuss
    • 8. In time study, normal time is more than the standard time.

    • Options
    • A. Yes
    • B. No
    • Discuss
    • 9. In jobbing production

    • Options
    • A. highly skilled workers are needed
    • B. unit costs are high
    • C. operations are labour-intensive
    • D. all of these
    • Discuss
    • 10. Slack may be positive, zero or negative.

    • Options
    • A. Agree
    • B. Disagree
    • Discuss