Home Mechanical Engineering Industrial Engineering and Production Management Comments

  • Question
  • The product layout


  • Options
  • A. lowers overall manufacturing time
  • B. requires less space for placing machines
  • C. utilises machine and labour better
  • D. all of these

  • Correct Answer
  • all of these 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. In Emerson's efficiency plan of wage incentive system, bonus is paid to a worker

    • Options
    • A. whose output exceeds 67% efficiency
    • B. on the percentage of time saved
    • C. on the percentage of time worked
    • D. on the percentage of standard time
    • Discuss
    • 2. The factors to be considered for production scheduling are

    • Options
    • A. component design
    • B. route sheet
    • C. time standards
    • D. all of these
    • Discuss
    • 3. Slack represents the difference between the

    • Options
    • A. earliest completion time and latest allowable time
    • B. latest allowable time and earliest completion time
    • C. earliest completion time and normal expected time
    • D. latest allowable time and normal allowable time
    • Discuss
    • 4. The purpose of micromotion study is to

    • Options
    • A. assist in finding out the most efficient way of doing work
    • B. train the individual operator regarding the motion economy principles
    • C. help in collecting the motion time data for synthetic time standards
    • D. all of the above
    • Discuss
    • 5. Which of the following statement is correct?

    • Options
    • A. When slack of an activity is zero, it falls only on critical path.
    • B. CPM technique is useful to minimise the direct and indirect expenses.
    • C. Critical path of a net work represents the minimum time required for completion of project.
    • D. all of the above
    • Discuss
    • 6. Merit rating is the method of determining the

    • Options
    • A. relative values of a job
    • B. worker's performance on a job
    • C. worth of a machine
    • D. value of overall production
    • Discuss
    • 7. PERT stands for

    • Options
    • A. Programme Estimation and Reporting Technique
    • B. Process Estimation and Review Technique
    • C. Programme Evaluation and Review Technique
    • D. Planning Estimation and Resulting Technique
    • Discuss
    • 8. When slack of an activity is zero, the activity is critical and any delay in its performance will delay the completion of the whole project.

    • Options
    • A. Yes
    • B. No
    • Discuss
    • 9. The main objective of work measurement is to

    • Options
    • A. plan and schedule of production
    • B. formulate a proper incentive scheme
    • C. estimate the selling prices and delivery dates
    • D. all of the above
    • Discuss
    • 10. Critical path method

    • Options
    • A. helps in ascertaining time schedules
    • B. makes better and detailed planning possible
    • C. provides a standard method for communicating project plans schedules and to time and cost performance
    • D. all of the above
    • Discuss