Follow-up prescribes the sequence of operations to be followed.
Options
A. Correct
B. Incorrect
Correct Answer
Correct
Industrial Engineering and Production Management problems
Search Results
1. A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is
5. Two alternatives can produce a product. First has a fixed cost of Rs. 2000 and a variable cost of Rs. 20 per piece. The second method has a fixed cost of Rs. 1500 and a variable cost of Rs. 30. The break even quantity between the two alternatives is