  • Follow-up prescribes the sequence of operations to be followed.


  • Options
  • A. Correct
  • B. Incorrect

  • Correct Answer
  • Correct 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is

    • Options
    • A. 0.50
    • B. 0.66
    • C. 0.84
    • D. 0.95
    • Discuss
    • 2. Product layout is best suited where

    • Options
    • A. one type of product is produced
    • B. product is standardised
    • C. product is manufactured in large quantities
    • D. all of the above
    • Discuss
    • 3. An event is a function of two or more activities.

    • Options
    • A. Correct
    • B. Incorrect
    • Discuss
    • 4. The planning and scheduling of job order manufacturing differ from planning and scheduling of mass production manufacturing.

    • Options
    • A. Correct
    • B. Incorrect
    • Discuss
    • 5. Two alternatives can produce a product. First has a fixed cost of Rs. 2000 and a variable cost of Rs. 20 per piece. The second method has a fixed cost of Rs. 1500 and a variable cost of Rs. 30. The break even quantity between the two alternatives is

    • Options
    • A. 25
    • B. 50
    • C. 75
    • D. 100
    • Discuss
    • 6. For material transportation, conveyors are used when the prevailing conditions include

    • Options
    • A. loads are uniform
    • B. routes do not vary
    • C. materials move relatively continuously
    • D. all of these
    • Discuss
    • 7. Which of the following statement is correct?

    • Options
    • A. When slack of an activity is zero, it falls only on critical path.
    • B. CPM technique is useful to minimise the direct and indirect expenses.
    • C. Critical path of a net work represents the minimum time required for completion of project.
    • D. all of the above
    • Discuss
    • 8. The purpose of micromotion study is to

    • Options
    • A. assist in finding out the most efficient way of doing work
    • B. train the individual operator regarding the motion economy principles
    • C. help in collecting the motion time data for synthetic time standards
    • D. all of the above
    • Discuss
    • 9. Slack represents the difference between the

    • Options
    • A. earliest completion time and latest allowable time
    • B. latest allowable time and earliest completion time
    • C. earliest completion time and normal expected time
    • D. latest allowable time and normal allowable time
    • Discuss
    • 10. The factors to be considered for production scheduling are

    • Options
    • A. component design
    • B. route sheet
    • C. time standards
    • D. all of these
    • Discuss