logo

CuriousTab

CuriousTab

Discussion


Home Mechanical Engineering Industrial Engineering and Production Management Comments

  • Question
  • An event is a function of two or more activities.


  • Options
  • A. Correct
  • B. Incorrect

  • Correct Answer
  • Correct 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. The planning and scheduling of job order manufacturing differ from planning and scheduling of mass production manufacturing.

    • Options
    • A. Correct
    • B. Incorrect
    • Discuss
    • 2. Two alternatives can produce a product. First has a fixed cost of Rs. 2000 and a variable cost of Rs. 20 per piece. The second method has a fixed cost of Rs. 1500 and a variable cost of Rs. 30. The break even quantity between the two alternatives is

    • Options
    • A. 25
    • B. 50
    • C. 75
    • D. 100
    • Discuss
    • 3. F. W. Taylor introduced a system of organisation known as

    • Options
    • A. line organisation
    • B. functional organisation
    • C. line and staff organisation
    • D. line, staff and functional organisation
    • Discuss
    • 4. The type of layout used for manufacturing steam turbines, is

    • Options
    • A. product layout
    • B. process layout
    • C. fixed position layout
    • D. any one of these
    • Discuss
    • 5. Dummy activities are used to

    • Options
    • A. determine the critical path
    • B. determine the project completion time
    • C. maintain the required net work
    • D. none of these
    • Discuss
    • 6. Product layout is best suited where

    • Options
    • A. one type of product is produced
    • B. product is standardised
    • C. product is manufactured in large quantities
    • D. all of the above
    • Discuss
    • 7. A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is

    • Options
    • A. 0.50
    • B. 0.66
    • C. 0.84
    • D. 0.95
    • Discuss
    • 8. Follow-up prescribes the sequence of operations to be followed.

    • Options
    • A. Correct
    • B. Incorrect
    • Discuss
    • 9. For material transportation, conveyors are used when the prevailing conditions include

    • Options
    • A. loads are uniform
    • B. routes do not vary
    • C. materials move relatively continuously
    • D. all of these
    • Discuss
    • 10. Which of the following statement is correct?

    • Options
    • A. When slack of an activity is zero, it falls only on critical path.
    • B. CPM technique is useful to minimise the direct and indirect expenses.
    • C. Critical path of a net work represents the minimum time required for completion of project.
    • D. all of the above
    • Discuss


    Comments

    There are no comments.

Enter a new Comment