  • Question
  • The correct sequence of phases in value engineering is


  • Options
  • A. creative phase, information phase, investigation phase, evaluation phase
  • B. information phase, creative phase, investigation phase, evaluation phase
  • C. investigation phase, information phase, creative phase, evaluation phase
  • D. creative phase, investigation phase, evaluation phase, information phase

  • Correct Answer
  • creative phase, information phase, investigation phase, evaluation phase 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. Which of the following are the principles of material handling?

    • Options
    • A. keep all the handling to the minimum
    • B. select only efficient handling equipment
    • C. move the heaviest weight to the least distance
    • D. all of the above
    • Discuss
    • 2. Gantt chart gives information about

    • Options
    • A. scheduling and routing
    • B. sales
    • C. production schedule
    • D. machine utilisation
    • Discuss
    • 3. The average time recorded by work study man for an operation is called

    • Options
    • A. standard time
    • B. normal time
    • C. representative time
    • D. none of these
    • Discuss
    • 4. Standard time is equal to

    • Options
    • A. normal time minus allowances
    • B. normal time plus allowances
    • C. representative time multiplied by rating factor
    • D. normal time taken by an operation
    • Discuss
    • 5. Valve analysis is particularly of interest when

    • Options
    • A. jobbing work economics are involved
    • B. production is on large scale
    • C. only few components are involved
    • D. costly equipment is used
    • Discuss
    • 6. Micromotion study is

    • Options
    • A. analysis of one stage of motion chart
    • B. motion study, when seen on a time chart
    • C. subdivision of an operation into therbligs and their analysis
    • D. enlarged view of motion study
    • Discuss
    • 7. Dummy activities are used to

    • Options
    • A. determine the critical path
    • B. determine the project completion time
    • C. maintain the required net work
    • D. none of these
    • Discuss
    • 8. The type of layout used for manufacturing steam turbines, is

    • Options
    • A. product layout
    • B. process layout
    • C. fixed position layout
    • D. any one of these
    • Discuss
    • 9. F. W. Taylor introduced a system of organisation known as

    • Options
    • A. line organisation
    • B. functional organisation
    • C. line and staff organisation
    • D. line, staff and functional organisation
    • Discuss
    • 10. Two alternatives can produce a product. First has a fixed cost of Rs. 2000 and a variable cost of Rs. 20 per piece. The second method has a fixed cost of Rs. 1500 and a variable cost of Rs. 30. The break even quantity between the two alternatives is

    • Options
    • A. 25
    • B. 50
    • C. 75
    • D. 100
    • Discuss