  • Question
  • Gantt chart gives information about


  • Options
  • A. scheduling and routing
  • B. sales
  • C. production schedule
  • D. machine utilisation

  • Correct Answer
  • production schedule 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. The average time recorded by work study man for an operation is called

    • Options
    • A. standard time
    • B. normal time
    • C. representative time
    • D. none of these
    • Discuss
    • 2. Standard time is equal to

    • Options
    • A. normal time minus allowances
    • B. normal time plus allowances
    • C. representative time multiplied by rating factor
    • D. normal time taken by an operation
    • Discuss
    • 3. Valve analysis is particularly of interest when

    • Options
    • A. jobbing work economics are involved
    • B. production is on large scale
    • C. only few components are involved
    • D. costly equipment is used
    • Discuss
    • 4. In a functional organisation

    • Options
    • A. quality of work is better
    • B. wastage of material is minimum
    • C. specialised knowledge and guidance to individual worker is provided
    • D. all of the above
    • Discuss
    • 5. Time study is carried out

    • Options
    • A. by finding all the significant informations regarding the job, work place and machine tool etc.
    • B. by breaking up each operation into small elements which are measurable with the help of the measuring device accurately
    • C. by observing and recording the time taken by the operator for an operation
    • D. all of the above
    • Discuss
    • 6. Which of the following are the principles of material handling?

    • Options
    • A. keep all the handling to the minimum
    • B. select only efficient handling equipment
    • C. move the heaviest weight to the least distance
    • D. all of the above
    • Discuss
    • 7. The correct sequence of phases in value engineering is

    • Options
    • A. creative phase, information phase, investigation phase, evaluation phase
    • B. information phase, creative phase, investigation phase, evaluation phase
    • C. investigation phase, information phase, creative phase, evaluation phase
    • D. creative phase, investigation phase, evaluation phase, information phase
    • Discuss
    • 8. Micromotion study is

    • Options
    • A. analysis of one stage of motion chart
    • B. motion study, when seen on a time chart
    • C. subdivision of an operation into therbligs and their analysis
    • D. enlarged view of motion study
    • Discuss
    • 9. Dummy activities are used to

    • Options
    • A. determine the critical path
    • B. determine the project completion time
    • C. maintain the required net work
    • D. none of these
    • Discuss
    • 10. The type of layout used for manufacturing steam turbines, is

    • Options
    • A. product layout
    • B. process layout
    • C. fixed position layout
    • D. any one of these
    • Discuss


    Comments

    There are no comments.

Enter a new Comment