  • Standard time is equal to


  • Options
  • A. normal time minus allowances
  • B. normal time plus allowances
  • C. representative time multiplied by rating factor
  • D. normal time taken by an operation

  • Correct Answer
  • normal time plus allowances 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. Valve analysis is particularly of interest when

    • Options
    • A. jobbing work economics are involved
    • B. production is on large scale
    • C. only few components are involved
    • D. costly equipment is used
    • Discuss
    • 2. In a functional organisation

    • Options
    • A. quality of work is better
    • B. wastage of material is minimum
    • C. specialised knowledge and guidance to individual worker is provided
    • D. all of the above
    • Discuss
    • 3. Time study is carried out

    • Options
    • A. by finding all the significant informations regarding the job, work place and machine tool etc.
    • B. by breaking up each operation into small elements which are measurable with the help of the measuring device accurately
    • C. by observing and recording the time taken by the operator for an operation
    • D. all of the above
    • Discuss
    • 4. Scheduling

    • Options
    • A. prescribes the sequence of operations to be followed
    • B. determines the programme for the operations
    • C. is concerned with starting of processes
    • D. regulates the progress of job through various processes
    • Discuss
    • 5. The mathematical technique for finding the best use of limited resources of a company in the maximum manner is known as

    • Options
    • A. value analysis
    • B. network analysis
    • C. linear programming
    • D. queuing theory
    • Discuss
    • 6. The average time recorded by work study man for an operation is called

    • Options
    • A. standard time
    • B. normal time
    • C. representative time
    • D. none of these
    • Discuss
    • 7. Gantt chart gives information about

    • Options
    • A. scheduling and routing
    • B. sales
    • C. production schedule
    • D. machine utilisation
    • Discuss
    • 8. Which of the following are the principles of material handling?

    • Options
    • A. keep all the handling to the minimum
    • B. select only efficient handling equipment
    • C. move the heaviest weight to the least distance
    • D. all of the above
    • Discuss
    • 9. The correct sequence of phases in value engineering is

    • Options
    • A. creative phase, information phase, investigation phase, evaluation phase
    • B. information phase, creative phase, investigation phase, evaluation phase
    • C. investigation phase, information phase, creative phase, evaluation phase
    • D. creative phase, investigation phase, evaluation phase, information phase
    • Discuss
    • 10. Micromotion study is

    • Options
    • A. analysis of one stage of motion chart
    • B. motion study, when seen on a time chart
    • C. subdivision of an operation into therbligs and their analysis
    • D. enlarged view of motion study
    • Discuss