logo

CuriousTab

CuriousTab

Discussion


Home Mechanical Engineering Industrial Engineering and Production Management Comments

  • Question
  • Scheduling


  • Options
  • A. prescribes the sequence of operations to be followed
  • B. determines the programme for the operations
  • C. is concerned with starting of processes
  • D. regulates the progress of job through various processes

  • Correct Answer
  • determines the programme for the operations 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. The mathematical technique for finding the best use of limited resources of a company in the maximum manner is known as

    • Options
    • A. value analysis
    • B. network analysis
    • C. linear programming
    • D. queuing theory
    • Discuss
    • 2. CPM stands for

    • Options
    • A. Combined Process Method
    • B. Critical Path Method
    • C. Common Planning Method
    • D. Critical Process Method
    • Discuss
    • 3. Queuing theory is used for

    • Options
    • A. job-shop scheduling
    • B. inventory problems
    • C. traffic congestion studies
    • D. all of these
    • Discuss
    • 4. Line organisation is suitable for

    • Options
    • A. sugar industries
    • B. oil refining industries
    • C. spinning and weaving industries
    • D. all of these
    • Discuss
    • 5. In inventory control, the economic ordering quantity is obtained by the quantity whose procurement cost is equal to inventory carrying cost.

    • Options
    • A. True
    • B. False
    • Discuss
    • 6. Time study is carried out

    • Options
    • A. by finding all the significant informations regarding the job, work place and machine tool etc.
    • B. by breaking up each operation into small elements which are measurable with the help of the measuring device accurately
    • C. by observing and recording the time taken by the operator for an operation
    • D. all of the above
    • Discuss
    • 7. In a functional organisation

    • Options
    • A. quality of work is better
    • B. wastage of material is minimum
    • C. specialised knowledge and guidance to individual worker is provided
    • D. all of the above
    • Discuss
    • 8. Valve analysis is particularly of interest when

    • Options
    • A. jobbing work economics are involved
    • B. production is on large scale
    • C. only few components are involved
    • D. costly equipment is used
    • Discuss
    • 9. Standard time is equal to

    • Options
    • A. normal time minus allowances
    • B. normal time plus allowances
    • C. representative time multiplied by rating factor
    • D. normal time taken by an operation
    • Discuss
    • 10. The average time recorded by work study man for an operation is called

    • Options
    • A. standard time
    • B. normal time
    • C. representative time
    • D. none of these
    • Discuss


    Comments

    There are no comments.

Enter a new Comment